The project of reconstruction and restoration with technical re-equipment of the existing building of the station - an architectural monument
Designed in collaboration with Valentirov&Partners
General Contractor - STROYCONTRACT LTD
Chief architects - Volodymyr Terentyev
Lead architects: Alex Valentirov, Ivan Yurima
Team: Nadia Pikhay, Igor Gudzenko, Anthon Sukhar, Vitaly Nikycky, Andriy Grytsay, Mikhail Vasin
Chief structural engineer - Yuriy Kozhanov
Restoration Architects - Grauzis and Partners
The main objectives of the project:
comprehensive restoration studies and a full structural and engineering survey of the station building;
bring the interior space of the station in line with the current passenger flow, taking into account repair and restoration works;
determine the function and necessity of using all empty premises that have been used for other purposes or not at all recently;
create conditions for the separation of long-haul and local passenger traffic, taking into account the prospective restoration of existing concourses;
Restoration of the main premises of the station - the central lobby and passenger waiting lounges
Technical re-equipment of all the station premises
Design of a business center on the site of unused or abandoned premises
Design and technical modernization of luggage storage facilities and service and technical premises
Access control systems with the installation of turnstiles, platform fences, reconstruction of sheds, and measures for safe exits from railcars
Landscaping